The Ollies' building HVAC replacement in Burnham, PA was a design/build project. The project entailed cooperation among MGM Mechanical, Trane, structural and HVAC engineers. Complicated is definetely a term to use for this job, due to the fact that Ollies' remained open during the construction process and it was summer time. First we removed the existing 1964 HVAC equipment and set a steel frame/platform from roof to main floor of building. Our new 70 ton Trane unit was delivered and set on steel platform. Within 4 business days of setting unit, various contractors were involved in electrical wiring, metal duct fabrication/installation, and additional steel work so that we could start up unit with Trane.

Special thanks to the following contractors who helped with this project: JR Young, Lepley Electrical, B & S Sheet Metal, JM Young Roofing, Tom Metz engineering, Larry Cox engineering, and of course, Stitzer Crane Services.